Source: European Parliament
Question for written answer E-002586/2025
to the Commission
Rule 144
Julie Rechagneux (PfE), Rody Tolassy (PfE), Aleksandar Nikolic (PfE), Tomáš Kubín (PfE), Auke Zijlstra (PfE), Mathilde Androuët (PfE), France Jamet (PfE), Marie-Luce Brasier-Clain (PfE), Silvia Sardone (PfE), Pierre Pimpie (PfE), Catherine Griset (PfE), Isabella Tovaglieri (PfE), Virginie Joron (PfE), António Tânger Corrêa (PfE), Pascale Piera (PfE), Jana Nagyová (PfE), André Rougé (PfE), Mireia Borrás Pabón (PfE), Hermann Tertsch (PfE), Raffaele Stancanelli (PfE), Nikola Bartůšek (PfE), Jorge Martín Frías (PfE), Christophe Bay (PfE)
On 28 April 2025, a major power outage affected almost all of the Iberian Peninsula and part of south-west France. According to several analysts, this instability was caused by rapid synchronisation failures in the grid, which is highly dependent on intermittent production from renewable sources.
In February 2024, Redeia, the Spanish operator, warned that the electricity system was becoming increasingly vulnerable due to the lack of dispatchable capacities and the difficulty of maintaining a balance between production and consumption in real time.
In parallel, the Renewable Energy Directive (RED III) sets a renewable energy use target of 42.5 % for each Member State by 2030. Several countries, including Spain, have already surpassed this threshold, even though their grid infrastructure or dispatchable capacity might not be entirely suitable.
In view of the above:
- 1.Does the Commission have a consolidated assessment of grid imbalance incidents in the Member States linked to predominantly intermittent production?
- 2.Does it believe that it is possible to meet the renewable energy target of 42.5 % by 2030, when several national electricity grids are already struggling to integrate a high share of intermittent energy without compromising the system’s stability?
- 3.Will it take account of reliability, flexibility or security of supply when assessing the national plans to contribute to the RED III goals?
Submitted: 26.6.2025